At a glance
| Land | State lease of an island, lagoon or plot (no freehold) |
|---|---|
| Lease term | 50 years; extendable to 99 for a fee |
| How islands are allocated | Public tender by the Ministry of Tourism; also cross-subsidy and direct allocation by government decision |
| Foreign ownership | Up to 100% of the leasehold rights in core tourism |
| Annual land rent | Per square metre of land; lower rates in less-developed atolls |
| Main taxes | 15% corporate tax, 17% tourism GST, US$12 Green Tax per guest-night |
Why investors still build in the Maldives
The Maldives has some of the highest resort room rates in the world. CBRE put 2025 average daily rates at about US$558 with 67% occupancy. The country had 1,293 registered tourist establishments and 68,733 beds in October 2026. But supply is growing faster than demand: in 2025 beds in operation rose 4.3% while bed-nights rose 2.4%, and arrivals in January–October 2026 were 3.5% below the same period of 2025. New projects need a clear positioning, not just an island.
The resort development process
- Find an island
Watch Ministry of Tourism tender announcements, or buy into an existing lease (see buying an existing resort). Remote atolls carry lower rent but higher logistics costs.
- Bid in the tender
Submit the lease acquisition cost you will pay (the bid), your investment plan, proposed bed count, timeline, and proof of funds and experience. The highest-scoring compliant bid wins.
- Set up the investment vehicle
Register a Maldivian company and obtain foreign investment approval under the Foreign Investment Act (No. 11/2024) and the October 2025 entry requirements.
- Sign the lease agreement
The agreement fixes the term, land rent, development period, minimum investment and milestones. Pay the acquisition cost as scheduled.
- Get environmental and building approvals
An environmental impact assessment is needed for island works, dredging and coastal structures, followed by design approvals.
- Build within the development period
Delays cost money: rent accrues, and the ministry can terminate leases where a property is not developed or redeveloped on time.
- Register and open
Obtain the tourism operating licence, register for TGST and Green Tax with MIRA, appoint an operator, and open.
What it costs
| Cost item | Guide | Notes |
|---|---|---|
| Lease acquisition cost | Bid-determined | From around US$150,000 for small hotel plots to millions for resort islands |
| Annual land rent | Per m² of island area | Remote atolls have had cheaper rates (for example, US$2–6/m² with annual caps in published proposals); central atolls cost more |
| Construction and fit-out | Project-specific | Luxury island resorts commonly cost tens of millions of US dollars; overwater villas, utilities and logistics drive cost |
| Utilities | Self-supplied | Power, desalination, sewage and waste are on-island systems |
| Pre-opening and working capital | Project-specific | Staff housing, training, marketing and seaplane or speedboat access |
| Lease extension (optional) | Fee set in law | 50 to 99 years: US$10m outside reduced-fee windows; see lease extensions |
Common deal structures
- 100% foreign-owned leaseholder company that owns and develops the resort, with a third-party brand operator.
- Joint venture with a Maldivian partner who already holds a lease and needs capital.
- Sale-and-leaseback or villa pre-sales to fund construction, where permitted.
- Sustainable township SEZ for very large mixed projects (US$500m+), with income tax at 5% for 10 years. See SEZs.
Risks to price in
- Oversupply in some atolls and softer 2026 demand.
- Construction import costs and logistics delays.
- Foreign currency access: banks must sell most FX receipts to the central bank and the parallel market premium is large. See currency guide.
- Sea-level rise and coastal erosion: budget for coastal protection.
- Regulatory change: the Tourism Act has been amended repeatedly since 2020.